+90 506 839 88 57Project requestTR

Reference project

Etapak – Solvent Recovery Plant Project

Activated-carbon solvent recovery plant built for Etapak: reference project with photographs of manufacturing and site installation.

Etapak – Solvent Recovery Plant Project – site image 1
Etapak – Solvent Recovery Plant Project – site image 1

Project data sheet

Project details

Data sheetEtapak

Project

Client
Etapak

Process

Method
Activated-carbon adsorption and thermal regeneration
Standard scope
Design, manufacturing, site installation, commissioning and operator training[C-01]The company’s turnkey scope; the project-specific scope has not been documented separately.

Commissioning year, air flow, capacity and measured results are not published without the client’s approval, which is why they do not appear on this page.

Process flow

General process flow of activated-carbon adsorption plants

  1. Collection and pre-treatmentfilter, cooling
  2. Adsorptionactivated-carbon beds
  3. Regenerationthermal desorption
  4. Condensation and separationcondenser, decanter
  5. Purificationdistillation, molecular sieve
  6. Storage and returnnitrogen-blanketed tank
Water-miscible solvents and mixtures need a purification step after condensation. The diagram shows the general flow of the method; it is not the layout, equipment list or capacity of this plant.

Site images

Manufacturing, installation and commissioning

  • Etapak – Solvent Recovery Plant Project – site image 1
  • Etapak – Solvent Recovery Plant Project – site image 2
  • Etapak – Solvent Recovery Plant Project – site image 3
  • Etapak – Solvent Recovery Plant Project – site image 4
  • Etapak – Solvent Recovery Plant Project – site image 5
  • Etapak – Solvent Recovery Plant Project – site image 6
  • Etapak – Solvent Recovery Plant Project – site image 7
  • Etapak – Solvent Recovery Plant Project – site image 8
  • Etapak – Solvent Recovery Plant Project – site image 9
  • Etapak – Solvent Recovery Plant Project – site image 10
  • Etapak – Solvent Recovery Plant Project – site image 11
  • Etapak – Solvent Recovery Plant Project – site image 12
Show all images (13)
  • Etapak – Solvent Recovery Plant Project – site image 13

Sources and method

What the information on this page rests on

Prepared by
Yeşil Çevre Makine
Prepared
Last updated

The project information on this page is limited to the client, location and solvent recorded in the project’s original entry on the site. Method and scope rest on the company catalogue, solvent properties on public data sheets.

Company statements and documents

Statements resting on these sources are Yeşil Çevre Makine’s own; they have not been verified by an independent body.

  1. C-01V.O.C. Solvent Geri Kazanım Tesisleri kataloğu (Türkçe)Yeşil Çevre Makine · 2022 · Accessed: 18 Eylül 2026 · Şirket belgesi

Planning a similar plant?

Tell us the solvent, the approximate consumption and the line. Our engineers call you to clarify the need and, where useful, plan on-site measurements.

What we ask for

  1. Solvent type
  2. Consumption or air flow
  3. Sector and line type
  4. Project stage

To reach us directly: +90 506 839 88 57 · info@yesilcevmak.com